On the pricing chart below; the “Basic“, “Mid” & “Upper” levels distinguish which the types of features and finishes you need.  Most projects fall between the Mid and Upper Levels.  Design, labor, materials, flooring, countertops and fixtures are included in the following estimates. Items NOT included are listed at the bottom.

BASIC LEVEL KITCHENS

Small
$25-30k
100-120 sqft
4-5 weeks
Medium
$30-35K
120-144 sqft
5-6 weeks
Large
$35-40k
144-180 sqft
6-7 weeks
  • Same cabinet layout
  • Modular prefinished cabinets
  • Classic granite counter tops
  • Install LVP or laminate flooring
  • Minimal drywall work
  • Paint walls & ceiling
  • New outlets & switches
  • Install new lights
  • Install appliances provided by owner
  • Stainless steel undermount sink & faucet

MID LEVEL KITCHENS

Small
$31-36k
100-120 sqft
5 weeks
Medium
$36-41K
120-144 sqft
6-7 weeks
Large
$41-46k
144-180 sqft
7-8 weeks
  • Minor changes to cabinet layout
  • Modular pre-finished cabinets
  • Quartz up to level 5 with full tile splash
  • Tile flooring
  • Paint kitchen two tone
  • Drywall as needed
  • New LED recessed lighting
  • Outlets & switches

UPPER LEVEL KITCHENS

Small
$51-56k
100-120 sqft
8-9 weeks
Medium
$56-61K
120-144 sqft
9-10 weeks
Large
$61-66k
144-180 sqft
10-12 weeks
  • Change layout
  • Move plumbing
  • Custom cabinets
  • Quartz up to level 9
  • Install high end appliances
  • New LED lighting
  • Under cabinet lighting
  • Full backsplash
  • Tile or Hardwood flooring

 

NOT INCLUDED

  • Permit fee
  • Engineering or Architect
  • Dryrot, Termite or Asbestos abatment